Your Privacy is Important to us

We encourage you to review our Terms of Service, and Privacy Policy.

By continuing, you agree to the Terms listed here. In case you want to opt out, please click "Do Not Sell or Share My Personal Information" link in the footer of this page.

Opt out of the sale or sharing of personal information

We won't sell or share your personal information to inform the ads you see. You may still see interest-based ads if your information is sold or shared by other companies or was sold or shared previously.

Continue on TOI App
Open App
Login for better experience!
Login Now
Welcome! to timesofindia.com
TOI INDTOI USTOI GCC
TOI+
  • Home
  • Live
  • TOI Games
  • Top Headlines
  • India
  • City News
  • Photos
  • Business
  • Real Estate
  • Entertainment
  • Movie Reviews
  • Lifestyle
  • Podcasts
  • Elections
  • Web Series
  • Sports
  • TV
  • Food
  • Travel
  • Events
  • World
  • Music
  • Astrology
  • Videos
  • Tech
  • Auto
  • Education
  • Log Out
Follow Us On
Open App
  • News
  • Videos
  • India
  • Elections
  • World
  • City
  • Tesseract
  • Life & Style
  • Entertainment
  • Business
  • Tech
  • TOI Games
  • Cricket
  • Sports
  • TV
  • Web Series
  • Education
  • Speaking Tree
  • Success Story of Visionary Leaders
  • TOI Newsletters
  • Health
  • Real Estate
  • Legal
  • Defence
  • Women

Chennai infrastructure push: Okkiyam Maduvu bridge expansion to enhance connectivity and flood control

R Ramesh Shankar
| TNN | Last updated on - Dec 20, 2025, 14:01 IST
Comments
Share
1/8

Project overview: Tackling flood risks

The Okkiyam Maduvu bridge expansion in Chennai is aimed at improving water flow through the Pallikaranai marshland, a key step in reducing flood risks that became apparent during Cyclone Michaung in December 2023.

2/8

Previous bridge limitations

The earlier bridge featured a 90-metre waterway with low vertical clearance, which was insufficient to handle excess water during heavy rains. This bottleneck contributed to significant flooding in surrounding areas, highlighting the need for a major infrastructure upgrade.

3/8

New design specifications

The new structure is designed with a 205-metre waterway and an extra 1.5-metre vertical clearance, allowing more water to pass quickly and reducing the risk of flooding downstream.

4/8

Completion of steel spans

CMRL has completed fabrication and deck-slab casting for three 40-metre steel spans on both sides of the existing bridge, a key step in widening the waterway.

5/8

Progress on waterway clearance

The upstream part is totally open with the waterway widened to 120 meters in width. The downstream part is 80% cleared, which will open fully between the 8th to 10th of September in 2025.

6/8

Approach span construction

Construction work on the approach spans is ongoing. These spans will connect the bridge to the city’s road network, ensuring smooth traffic flow once the bridge is operational.

7/8

Integration with road network

Once completed, the new bridge will be connected with the road network of Chennai. This will help people move through the area without any hassle

8/8

Timeline and public use

The expansion project is expected to finish in September 2025. The new bridge will not only act as a flood-mitigation structure when opened; it will also function as a public road for the Chennai residents.

Top Comment
N
Narendra Kumar
154 days ago
Expected completion September 2025 ?? Please chck content before publishing.
Read allPost comment
Photostories
  • Top 10 most visited states of America and travellers should know
  • Aishwarya Rai Bachchan ended Cannes 2026 in sculpted coutures and main-character energy
  • 5 perfect ways travellers can spend summer holidays in Uttarakhand
  • 5 animals that are faster than a cheetah
  • Travel trivia: 10 countries famous for what they don’t have
  • This viral Zebra puzzle has left thousands confused, can you find the hidden Tiger in just 10 seconds?
  • ‘There is no reason not to follow your heart’: 7 life lessons to teach kids from Steve Jobs’ iconic speech
  • Shoaib Ibrahim reveals his father suffered a brain hemorrhage and is admitted to the ICU; says 'He had internal bleeding’
  • 10 small habits that could quietly change your life by the end of 2026
  • Bill Gates’ iconic lakeside property worth $130 million is a futuristic mansion with rare books and underwater music
Explore more Stories
  • 8
    Bengaluru East station roars back to life after massive rail makeover
  • 10
    Slums beside Bandra station gone. Mumbai’s next big rail project starts here
  • 7
    Rs 20,000 crore, 16 stations: What’s in pipeline for Karnataka’s 1st inter-district metro
  • 10
    Bengaluru set to get India’s 2nd-largest cricket stadium: All you need to know
  • 10
    Another fuel shock? Petrol, diesel and CNG prices climb again
Up Next
  • News
  • /
  • City
  • /
  • Chennai
  • /
  • Chennai infrastructure push: Okkiyam Maduvu bridge expansion to enhance connectivity and flood control
About UsTerms Of UsePrivacy PolicyCookie Policy

Copyright © May 26, 2026, 01.35AM IST Bennett, Coleman & Co. Ltd. All rights reserved. For reprint rights: Times Syndication Service