Your Privacy is Important to us

We encourage you to review our Terms of Service, and Privacy Policy.

By continuing, you agree to the Terms listed here. In case you want to opt out, please click "Do Not Sell or Share My Personal Information" link in the footer of this page.

Opt out of the sale or sharing of personal information

We won't sell or share your personal information to inform the ads you see. You may still see interest-based ads if your information is sold or shared by other companies or was sold or shared previously.

Continue on TOI App
Open App
Login for better experience!
Login Now
Welcome! to timesofindia.com
TOI INDTOI USTOI GCC
TOI+
  • Home
  • Live
  • TOI Games
  • Top Headlines
  • India
  • City News
  • Photos
  • Business
  • Real Estate
  • Entertainment
  • Movie Reviews
  • Lifestyle
  • Podcasts
  • Elections
  • Web Series
  • Sports
  • TV
  • Food
  • Travel
  • Events
  • World
  • Music
  • Astrology
  • Videos
  • Tech
  • Auto
  • Education
  • Log Out
Follow Us On
Open App
  • News
  • Videos
  • India
  • Election Results 2026
  • World
  • City
  • Tesseract
  • Life & Style
  • Entertainment
  • Business
  • Tech
  • TOI Games
  • Cricket
  • Sports
  • TV
  • Web Series
  • Education
  • Speaking Tree
  • Success Story of Visionary Leaders
  • TOI Newsletters
  • Health
  • Real Estate
  • Legal
  • Defence
  • Women

Byculla Cable-Stayed Flyover — How Mumbai’s Rs 805-Crore Project Will Decongest Traffic Between Lalbaug and Mazgaon

Last updated on - Oct 28, 2025, 15:08 IST
Comments
Share
1/8

Mumbai’s landmark Rs 805 crore cable-stayed flyover announced

The Brihanmumbai Municipal Corporation (BMC) has unveiled a ₹805-crore cable-stayed flyover project to connect the Y-Bridge at Byculla with JJ Flyover.
Planned to ease congestion in the dense Lalbaug–Mazgaon corridor, this ambitious link will be one of South Mumbai’s most significant infrastructure upgrades in years.

2/8

Direct link to Eastern Freeway for seamless connectivity

The project includes two new approach arms that will directly connect Olivant Bridge in Mazgaon with the Eastern Freeway. Once operational, motorists traveling from Byculla and Lalbaug will be able to bypass key choke points and enjoy smoother, faster access to south and central Mumbai.

3/8

1.18km engineering marvel across Byculla

Spanning 1,182 metres in total, the Byculla Cable-Stayed Flyover will include a striking 230-metre cable-stayed section as its centerpiece. Designed for high-capacity traffic movement, it will link major city arteries and reduce travel time during peak commuting hours.

4/8

Redesigned ramps and viaducts for efficient traffic flow

The plan features a 312-metre viaduct towards JJ Flyover, and two more stretches—290 metres on the west and 350 metres on the east near the Y-Bridge. These new lanes and ramps will improve access between key junctions, easing bottlenecks at Richardson and Cruddas Road.

5/8

Modern materials and structural innovation

The flyover will incorporate stainless steel girders, rigid pavements, and reinforced ramps designed to handle high daily vehicle loads. This combination of durability and design will ensure a longer lifespan, reduced maintenance, and improved safety for thousands of commuters every day.

6/8

Comprehensive urban infrastructure upgrades

Beyond the main structure, the project will add supporting urban features such as new drainage lines, noise barriers, and road furniture. These improvements aim to enhance driving comfort, pedestrian safety, and overall environmental quality along the entire stretch.

7/8

Managing traffic during construction

BMC officials have assured that detailed traffic diversion plans will be implemented in coordination with the Mumbai Traffic Police. The goal is to minimize disruption to daily commuters while maintaining accessibility across Lalbaug, Mazgaon, and Byculla during the build phase.

8/8

18-Month construction timeline

The estimated construction period is 18 months, though the final schedule is yet to be confirmed. Once completed, the Byculla Cable-Stayed Flyover will stand as a symbol of Mumbai’s next-generation infrastructure—linking heritage precincts with modern engineering. (All photo credits: AI)

Start a Conversation

Post comment
Photostories
  • How to make high-protein Besan Pyaz Ka Paratha for summer breakfast
  • Iconic pictures from Jr NTR’s life as the ‘Dragon’ star celebrates his 43rd birthday; click with Aamir Khan, Mohanlal
  • Thought of the day, inspired by Bhagavad Gita: Discipline today creates peace tomorrow
  • Graduation season 2026: Angelina Jolie’s daughter to Reese Witherspoon’s son, celebrity kids who got their degrees this year
  • 10 baby boy names that mean Sun in different languages
  • Top 10 most valuable currencies in the world right now
  • Morning affirmation at 5 am: The self-talk habit quietly changing people’s mornings
  • Jacqueline Fernandez turns Cannes 2026 into a vintage fashion fantasy with her glamorous sequin look
  • Inside the Jolie-Pitt family: All about Angelina Jolie and Brad Pitt's six children
  • Think they’re polar bears? These 5 dogs can easily fool you
Explore more Stories
  • 10
    Twisha Sharma death: From dating app romance to murder allegations and missing husband — what we know
  • 7
    Bengaluru ORR tech corridor set for Rs 378-crore concretisation, year-long traffic chaos likely
  • 7
    India’s largest rail TBMs deployed for Mumbai-Ahmedabad bullet train underground section: What we know
  • 7
    India achieves milestone as first domestically produced C-295 aircraft is ready for flight test
  • 7
    Bengaluru Airport Breaks Records With 2.8 Lakh Flight Movements in One Year
Up Next
  • News
  • /
  • City
  • /
  • Mumbai
  • /
  • Byculla Cable-Stayed Flyover — How Mumbai’s Rs 805-Crore Project Will Decongest Traffic Between Lalbaug and Mazgaon
About UsTerms Of UsePrivacy PolicyCookie Policy

Copyright © May 20, 2026, 09.00AM IST Bennett, Coleman & Co. Ltd. All rights reserved. For reprint rights: Times Syndication Service