First cutterhead lowered for Mumbai-Ahmedabad Bullet Train tunnel boring machine at Vikhroli
Mumbai: In a major step forward for the Mumbai-Ahmedabad Bullet Train project, the first 350-tonne cutterhead of a Tunnel Boring Machine (TBM) has been lowered at Vikhroli, marking a key milestone in the construction of the high-speed rail corridor’s underground section. The giant cutterhead, measuring 13.6 metres in diameter, forms the front end of the TBM and completes the primary assembly of its main shield.
The Mumbai tunnel, one of the most complex stretches of the project, will extend for 21km, of which 16 km will be built using two massive TBMs, each weighing more than 3,000 tonnes. The tunnel includes a 7km section beneath Thane Creek, set to become India’s first undersea rail tunnel. These are also the largest TBMs ever deployed for rail tunnel construction in the country.
Designed to excavate a single large tunnel carrying both up and down lines of the bullet train corridor, the cutterhead is an engineering feat in itself. Weighing as much as nearly 250 midsize SUVs, it arrived at the site in five separate consignments and was assembled with 1,600 kg of precision welding.
“The cutterhead is equipped with 84 cutter discs, 124 scrapers and 16 bucket lips. The cutter discs break through rock and soil at the tunnel face, while the scrapers help clear muck efficiently,” an official said. The bucket lips guide the excavated material into the muck chamber, from where it is transported out through the pipeline system.
From Vikhroli, this TBM will bore nearly 6km towards Bandra-Kurla Complex (BKC), passing beneath a dense urban landscape and the Mithi river before being retrieved at the under-construction Mumbai Bullet Train station at BKC.
Given the challenging geology and urban setting, extensive monitoring systems are being deployed to ensure safe tunnelling and protect nearby structures. These include surface settlement points, optical displacement sensors or tilt meters, 3D targets, strain gauges and seismographs to track vibration and ground movement in real time, an official said.
The lowering of the cutterhead signals not just progress in construction, but the arrival of a new scale of tunnelling technology for India’s first bullet train project.
Designed to excavate a single large tunnel carrying both up and down lines of the bullet train corridor, the cutterhead is an engineering feat in itself. Weighing as much as nearly 250 midsize SUVs, it arrived at the site in five separate consignments and was assembled with 1,600 kg of precision welding.
“The cutterhead is equipped with 84 cutter discs, 124 scrapers and 16 bucket lips. The cutter discs break through rock and soil at the tunnel face, while the scrapers help clear muck efficiently,” an official said. The bucket lips guide the excavated material into the muck chamber, from where it is transported out through the pipeline system.
From Vikhroli, this TBM will bore nearly 6km towards Bandra-Kurla Complex (BKC), passing beneath a dense urban landscape and the Mithi river before being retrieved at the under-construction Mumbai Bullet Train station at BKC.
Given the challenging geology and urban setting, extensive monitoring systems are being deployed to ensure safe tunnelling and protect nearby structures. These include surface settlement points, optical displacement sensors or tilt meters, 3D targets, strain gauges and seismographs to track vibration and ground movement in real time, an official said.
The lowering of the cutterhead signals not just progress in construction, but the arrival of a new scale of tunnelling technology for India’s first bullet train project.
Comments (1)
G
Ganesh SkMost Interacted
1 day ago
Wow! THIS is news! The bullet train project is behind schedule by years. Indonesia planned its own high speed train AFTER we did a...Read More
Reply
0
Reply
end of article
In Mumbai
- Mumbai entrepreneur duped by acquaintance in Rs 7 crore GST dues fraud
- 7-year-old boy drowns in Virar resort in Maharashtra
- Bread prices up by Rs 5 a loaf, hike follows soon after milk price rise in Mumbai
- 32-year-old man on bike killed after auto-rickshaw driver strikes his two-wheeler in Mumbai
- Two labourers die after falling off under-construction buildings in Mumbai, contractors booked for negligence
- More than 15 lakh chemists, druggists to observe strike on May 20 against online medicine sale: AIOCD
- Court reserves order till May 21 in 2008 railway exam assault case; Maharashtra Navnirman Sena chief among accused
Featured In City
- At 94, Deve Gowda defies age and ailments to stay at heart of politics
- 'Maa, mujhe yahan se le jao, please': Twisha Sharma’s messages to mother before death
- 'Provided Rs 50,000 regularly': Ex-judge counters dowry allegations in Twisha Sharma death case
- 'Ladke jhool nai paate, they are treated as criminals': Ex-judge on Twisha Sharma 'dowry' death
- What happens after a woman makes that helpline call
- Pune horror: Four men arrested after lawyer complains of sexual harassment in car
- TN govt, GCC council relationship on the rocks, civic projects may take a hit
Photostories
- Traditional Indian cooling methods that still work today
- Last chance! 5 tiger safaris to experience in India before the wildlife season ends in June
- Navjot Singh Sidhu’s ₹25 crore luxury mansion in Amritsar is defined by cricket success, ancient trees, and palace-style interiors
- Who is Josh Heuston? Inside the rise of 'Off Campus' breakout star Justin Kohl
- Art quote of the day by Pablo Picasso: "Art washes away from the soul the dust of everyday life"
- From samosas to dokla: 10 common Indian snacks and how many calories they contain
- What Gurukul education taught children that modern schools often miss
- PCOS isn’t only a fertility issue anymore: The hidden metabolic risks women must know
- Huma Qureshi closed Cannes 2026 with a show-stopping velvet moment
- Thought of the day inspired by Bhagavad Gita: Let go without losing compassion
Videos
03:19 “Fuel Prices Rise Again”: Petrol, Diesel Rates Hiked Across India Amid Global Oil Surge03:19 Tamil Nadu CM Vijay Pays Tribute To Former LTTE Chief Prabhakaran On Death Anniversary- India’s Agni Missile Journey: Could Agni-VI Become A 10,000 KM ICBM?
03:04 Suvendu Adhikari Says ED Granted Sanction To Prosecute Sandeep Ghosh In R.G. Kar Case03:07 Norwegian Reporters Question India On Trust And PM Modi’s Media Interactions During Oslo Visit07:07 India Invites Norway For Big Investment Push In Shipbuilding And Green Energy Sectors09:09 'Time Has Come': Suvendu's 'Deportation' Warning In Bhabanipur, Vows Action Over Kolkata Violence04:43 Delhi High Court Denies Interim Relief To Vinesh Phogat, Wrestler Barred From Asian Games Trials- “India Is Now Naxal-Free”: Home Minister Amit Shah Declares End Of Maoist Insurgency From Bastar
Hot Picks
Top Trends
Up Next
Follow Us On Social Media