Your Privacy is Important to us

We encourage you to review our Terms of Service, and Privacy Policy.

By continuing, you agree to the Terms listed here. In case you want to opt out, please click "Do Not Sell or Share My Personal Information" link in the footer of this page.

Opt out of the sale or sharing of personal information

We won't sell or share your personal information to inform the ads you see. You may still see interest-based ads if your information is sold or shared by other companies or was sold or shared previously.

Continue on TOI App
Open App
Login for better experience!
Login Now
Welcome! to timesofindia.com
TOI INDTOI USTOI GCC
TOI+
  • Home
  • Live
  • TOI Games
  • Top Headlines
  • India
  • City News
  • Photos
  • Business
  • Real Estate
  • Entertainment
  • Movie Reviews
  • Lifestyle
  • Podcasts
  • Elections
  • Web Series
  • Sports
  • TV
  • Food
  • Travel
  • Events
  • World
  • Music
  • Astrology
  • Videos
  • Tech
  • Auto
  • Education
  • Log Out
Follow Us On
Open App
  • News
  • Videos
  • India
  • Election Results 2026
  • World
  • City
  • Tesseract
  • Life & Style
  • Entertainment
  • Business
  • Tech
  • TOI Games
  • Cricket
  • Sports
  • TV
  • Web Series
  • Education
  • Speaking Tree
  • Success Story of Visionary Leaders
  • TOI Newsletters
  • Health
  • Real Estate
  • Legal
  • Defence
  • Women

Rs 6,700 crore project: How 'missing link' will improve Mumbai–Pune connectivity

TOI City Desk
| TIMESOFINDIA.COM | Last updated on - May 2, 2026, 16:09 IST
Comments
Share
1/10

Missing Link Opens on Expressway

The long-awaited 19.8 km stretch on the Mumbai–Pune Expressway has been inaugurated, improving connectivity between the two cities and marking a major milestone in Maharashtra’s transport infrastructure development.

2/10

Travel Time and Distance Reduced

The new link bypasses the Khandala ghat section, cutting travel time by 25–30 minutes and shortening the route by around 6 km, offering faster and more efficient movement. (PHOTO CREDIT: Maharashtra CM Devendra Fadnavis/X)

3/10

High-Cost Engineering Project

Constructed at a cost of nearly ₹6,700 crore, the project includes tunnels, viaducts and elevated roads, showcasing advanced engineering solutions to overcome complex terrain and geological challenges.

4/10

Landmark Cable-Stayed Bridge

A 182-metre-high cable-stayed bridge over Tiger Valley is a highlight, ranking among India’s tallest, and designed to support smooth transit across a difficult mountainous section. (PHOTO CREDIT: Mahrashtra CM Devendra Fadnavis/X)

5/10

Pune-Bound Lane Opened First

Authorities opened the Pune-bound lane immediately after inauguration to ease congestion in the ghat area, while the Mumbai-bound lane was scheduled to open later the same night. (PHOTO CREDIT: Mahrashtra CM Devendra Fadnavis/X)

6/10

Designed for Extreme Weather

The bridge structure is engineered to withstand wind speeds up to 240 kmph, with international-standard testing ensuring stability and safety under severe climatic conditions, including cyclonic situations. (PHOTO CREDIT: Maharashtra CM Devendra Fadnavis/X)

7/10

Concerns Over Fog Conditions

The bridge’s elevation may lead to dense fog during monsoon and winter, which could reduce visibility and pose challenges for vehicles travelling at high speeds.

8/10

Strict Speed Limits Enforced

Speed limits have been fixed at 100 kmph for cars and 80 kmph for buses, with authorities emphasising strict lane discipline to ensure safety and prevent accidents on the new stretch.

9/10

Project Overcame Technical Challenges

The alignment passes nearly 180 metres below Lonavla lake, making tunnelling highly complex. Earlier shelved, the project was revived after experts confirmed its feasibility through advanced engineering studies.

10/10

Limited Access in Initial Phase

Initially, only light motor vehicles and passenger buses are allowed on the new route, with heavy goods vehicles restricted until at least October 31 to manage traffic and ensure safety.

Start a Conversation

Post comment
Photostories
  • Kishwer Merchant recalls her father’s reaction to her interfaith marriage and age gap with Suyyash Rai; reacts to her son being trolled for wearing a skull cap
  • Lauki vs Tori: Which has more nutrition for summer and 5 interesting ways to eat them
  • From transparent bodies to underground lives: 5 bizarre frogs you’ve probably never heard of
  • Cannes 2026:Why Sanam Saeed’s Cannes debut is a major moment for Pakistani cinema
  • How to grow butterfly-friendly native plants in Indian city home gardens
  • Not just travel: 10 cheapest countries to retire in — 9 and 10 will surprise you
  • 8 modern TV unit designs to instantly upgrade your living room
  • 5 adorable dog breeds that stay puppy-sized forever
  • Horses can sleep standing up? 5 surprising facts about these animals
  • 5 practical ways to make gratitude a habit (even when life feels difficult)
Explore more Stories
  • 10
    Petrol, diesel, CNG get costlier: Check how much you’ll pay in your city
  • 11
    Just 122km from Mumbai, kids from this village trek for hours to fetch drinking water
  • 7
    Metro 13 takes shape: 24.5km Bhayander-Virar corridor set to recast commuting in western Mumbai
  • 7
    Rs 3,500 crore boost for Chennai: Inside the upgraded double-decker port corridor plan
  • 9
    Mystery shrouds Prateek Yadav’s death in Lucknow: What we know so far
Up Next
  • News
  • /
  • City
  • /
  • Mumbai
  • /
  • Rs 6,700 crore project: How 'missing link' will improve Mumbai–Pune connectivity
About UsTerms Of UsePrivacy PolicyCookie Policy

Copyright © May 15, 2026, 11.16PM IST Bennett, Coleman & Co. Ltd. All rights reserved. For reprint rights: Times Syndication Service